INDIANAPOLIS MEGASITE
BUCK CREEK DEVELOPMENT IN HANCOCK COUNTY, INDIANA
REGIONAL FACT SHEET
CLIMATE
Daily Average Temperature (°F):
-
July: 75.4°
-
January: 27.6°
Annual Average Temperature: 52.8
Annual Average Rainfall: 41.2"
Annual Average Snowfall: 24.9"
NEARBY MAJOR COMPANIES
Walmart: 2.3 miles
Amazon: 2.9 miles
Progressive Logistics: 2.9 miles
Smithfield: 4.1 miles
Spectra Premium: 4.2 miles
Yusen Logistics: 4.2 miles
Carvana: 5.4 miles
Eli Lilly: 9.0 miles
Salesforce: 19.6 miles
Cummins: 19.9 miles
Anthem Inc: 20.2 miles
Rolls-Royce: 20.3 miles
NATURAL DISASTERS (1950 - 2021)
DEMOGRAPHICS
Hurricane Frequency: 0 Events
Tornado Frequency: 0.2 days/year
Flood Frequency: 0.3 days/year
Hailstorm Frequency: 1.3 days/year
Seismic Rating: Zone 1 (low risk)
Nearest Major City: Greenfield (Hancock County)
Nearest Metropolitan Area: Indianapolis (Marion County)
Hancock County Population: 79,553 (2020)
Hancock County Population Growth Over 10-Years: 13.2%
Workforce (Within 60-Min Away): 1,020,908 (Emsi, 2021)
The site is not prone to extreme weather events and natural disasters such as wildfires, floods, tornados, hurricanes, typhoons, and tsunamis, and no known production operation disruptions due to extreme weather events or natural disasters.
PERMIT TIMING
PERMITS EASILY ATTAINABLE AS LITTLE AS 3-4 MONTHS
Rezoning Application >2 Months
Variances 1.5 Months
Improvement Permit 4-6 Weeks
Local Building Permit Upon Receipt of State Release
State Building Design Release 3 Weeks
Title V (Major/Minor) 120 Days
Note: Past permits have been expedited based on large-impact users
_edited.png)
Distances to Nearby Metropolitan Areas
-
Indianapolis, IN: 12-miles
-
Louisville, KY: 128-miles
-
Columbus, OH: 159-miles
-
Chicago, IL: 195-miles
-
St. Louis, MO: 265-miles
-
Detroit, MI: 269-miles
Permit Processing Details
It is anticipated that land entitlements including zoning, required variances, local and state permits could be achieved in four to eight months and may be fast tracked to expedite a project to 3-4 months. Users with major consumption requirements may anticipate a startup within 2 years for utility main extensions and minor system upgrades.